Skip to content

chore(deps): bump pnpm/action-setup from 5.0.0 to 6.0.0 #97

chore(deps): bump pnpm/action-setup from 5.0.0 to 6.0.0

chore(deps): bump pnpm/action-setup from 5.0.0 to 6.0.0 #97

Triggered via pull request April 20, 2026 23:30
Status Failure
Total duration 26s
Artifacts

ci.yml

on: pull_request
Matrix: test-matrix
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Test Matrix (Node 20)
Process completed with exit code 1.
Test Matrix (Node 22)
The strategy configuration was canceled because "test-matrix._20" failed
Test Matrix (Node 22)
Process completed with exit code 1.
Test Matrix (Node 18)
The strategy configuration was canceled because "test-matrix._20" failed
Test Matrix (Node 18)
Process completed with exit code 1.
Lint
Process completed with exit code 1.
Test
Process completed with exit code 1.
Test
At least one Node compatibility test failed.