Problem
The planned product surface is much larger than the current test suite, so dotPilot needs a tracked validation epic before implementation starts landing.
Scope
- Track unit, integration, Orleans, UI, local-runtime, CI, and packaging validation growth
- Keep the repo on the existing real validation path instead of adding fake smoke checks
Out of scope
- Replacing the current validation workflow with non-repo commands
- Weakening quality gates to make the backlog easier to ship
Planned child issues
- Add unit and integration tests for contracts, adapters, and persistence
- Add Orleans integration tests for orchestration and checkpoint-resume
- Expand Uno.UITests for the workbench and operator flows
- Add local runtime smoke tests
- Update CI and packaging validation for the expanded desktop product surface
Definition of Done
- The validation issues exist and reference this epic
- The epic preserves the current repo policy of real automated verification
Verification
- Child issues reference this epic
- The epic is concrete enough to drive test growth alongside implementation
Problem
The planned product surface is much larger than the current test suite, so dotPilot needs a tracked validation epic before implementation starts landing.
Scope
Out of scope
Planned child issues
Definition of Done
Verification